- Microsoft has introduced the Project Calendar Control feature in Project Operations to simplify the management of project calendars.
- The previous process of copying work hours from resources to calendar templates and then to projects was cumbersome and inefficient.
- The Project Calendar Control feature is designed for resource and non-stocked based scenarios in Project Operations.
- It is compatible with Project Operations in a Microsoft Dataverse environment, version 4.88.0.127, and became generally available in November 2023.
- The new feature allows project managers to directly access and edit project work hours through a dedicated calendar tab on the project entity.
- The streamlined process eliminates the need for intermediary steps and offers a more intuitive way to manage project calendars.
- Any changes made to work hours are instantly reflected in the project calendar, ensuring real-time updates.
- The Project Calendar Control feature reduces confusion by implementing dynamic links instead of static copies, reducing discrepancies between calendar templates and project calendars.
- The simplified process enhances collaboration among project teams by providing a clear and efficient way to manage work hours without complex copying procedures.