Plaza 365
Plaza 365

No results found for your search

RegisterLog in

2

Visit article

#change

#item

#production

Dynamics 365 Intelligent Order Management

Category

Dec 25, 2024

Published date

Text

Article Type


AI Summary

  • In the manufacturing industry, there are scenarios where it is necessary to change bill of materials (BOM) items due to various reasons such as lack of availability or price increases.
  • Microsoft has introduced a new feature that allows users to switch out BOM items on planned or estimated production orders.
  • Prerequisites for altering BOM items on production orders include the system version being 10.0.38 or later and enabling the "Change BOM item" feature in feature management.
  • BOM items can only be changed for production orders with a status of Estimated or Scheduled.
  • An example using finish good L0001 is provided in the article.
  • Steps to change BOM items on production orders include creating a production order, changing the status to Estimate, selecting raw materials to be replaced, specifying the new item and quantity, and confirming the change in the production order lines tab.
  • After changing the BOM item, the new raw material is considered for the production order instead of the original material.
  • By activating the "Change BOM item" feature on system version 10.0.38 or later, users can alter BOM items on Estimated or Scheduled production orders.

Registered users can view the full text for FREE!

Sign In Now!