- The article discusses the problem of executing a large number of tasks simultaneously in Microsoft Dynamics 365 for Finance and Operations, leading to high DTU utilization.
- The author mentions that the "Priority Based Scheduling" feature in Dynamics 365 allowed for assigning specific batch servers to a batch group to increase capacity and limit capacity for batch groups.
- With the introduction of the "Batch concurrency control" feature in version 10.0.38 PU63, it is now possible to limit the parallel tasks in a specific batch group and avoid the negative impact on other users.
- The new field added to the batch group allows users to specify the maximum number of tasks that can run in parallel at a time for a batch job in the batch group.
- The help text of the field advises setting the value to zero if concurrency control is not necessary and to -1 to stop all batch jobs in the batch group.
- However, it is important to note that this feature should not be used for batch jobs with over 5000 concurrent tasks, as it may negatively impact batch scheduling performance.
- The author highlights the use of this feature to limit and throttle the number of available tasks per batch group, similar to the previous method of selecting only a few batch servers for a specific batch group.
- By utilizing the "Batch concurrency control" feature and selecting the right batch group, the author suggests that the negative impact on other users could have been avoided in their specific scenario.